Use this request for bid template to get comparable prices from contractors and suppliers: the sections to include, a bid form, and a filled-in example.

A request for bid is the document you send to contractors or suppliers when you know exactly what you need and want each of them to price the same job. A good request for bid template keeps that comparison fair: every bidder gets the same scope, the same rules, and the same form to fill in. The result is a stack of bids you can line up side by side instead of a pile of quotes that cover slightly different things.
The three documents sound alike, and buyers often use the names loosely. They answer different questions.
| Document | Use it when | How you choose |
|---|---|---|
| Request for bid (invitation to bid) | The scope is fixed and you know what you want | Mostly on price, among bidders who meet the requirements |
| Request for proposal | You have a problem and want to compare approaches | Price plus approach, experience, and fit |
| Request for quote | You need a price on a defined item or small job | Quick price comparison, often ending in a purchase order |
PMStudyCircle's guide to invitations to bid puts the first row this way: buyers use an invitation to bid when they know exactly what they need and want the best price. An RFP fits the opposite case, where the buyer has a problem and is open to different ways of solving it. If you are on the receiving end of an RFP, our business proposal template covers how to answer one.
Federal sealed bidding shows the logic in its strictest form. Under the Federal Acquisition Regulation, bids are evaluated without discussions, and the contract goes to the responsible bidder whose conforming bid is most advantageous to the government, considering only price and the price-related factors named in the invitation. You do not need that formality for a kitchen remodel, but the principle carries over: set the rules before bids arrive, then apply them the same way to everyone.
Public owners publish their bid documents in detail, which makes them a useful model for any request for bid template. The University of California's facilities manual describes a request for bid that names the place of bid submission, the bid deadline, the project name and number, and a description of the work. It then attaches bidding requirements and a bid form. A small business can borrow that structure and cut it down to seven sections.
| # | Section | What it holds |
|---|---|---|
| 1 | Invitation | Project name, who is asking, where and when bids are due |
| 2 | Scope of work | What you need done or supplied, with specifications |
| 3 | Instructions to bidders | How to prepare, ask questions, and submit |
| 4 | Bid form | The one place bidders write their price |
| 5 | Evaluation and award | How you will choose, stated before bids arrive |
| 6 | Terms | Schedule, payment, insurance, and any security |
| 7 | Addenda | Written changes you issue before the deadline |
Open with the facts a bidder needs to decide whether to respond: your business name, a one-paragraph description of the job, the submission method, the deadline, and a named contact. Give the project a short name or number, and ask bidders to put it on every page they return.
This is the section that decides how good your bids will be. The federal rule cited above asks for requirements described clearly, accurately, and completely, and bars restrictions that needlessly narrow the field of bidders. For a small job, that means measurements, materials, quantities, quality standards, access and working hours, and what you will supply yourself. Attach drawings, photos, or product sheets rather than describing them.
The University of California manual treats these as the procedures bidders must follow to prepare and submit responsive bids. Yours can be a half page:
A bid proposal form is the single page where each bidder states a price and commits to your terms. The University of California manual says the bid form sets out the major conditions of the contract, and that the accepted bid becomes the basis of the agreement. Treat yours the same way: nothing on it should surprise anyone later.
Say how you will decide, in plain terms. If price alone decides among qualified bidders, say so. If you will also weigh schedule, references, or warranty, list those factors in order of importance. Changing criteria after you see the bids undermines the whole process and invites disputes.
Cover the schedule and milestones, how and when you pay, and what the bidder must carry. Ask for a certificate of insurance and check it against your needs.
Our guide to what general liability insurance covers explains what a contractor's policy should address. On larger jobs, the University of California manual shows that bid security, usually a bid bond or certified check, is a standard requirement. It protects the owner against the cost of a bidder who backs out.
EntraWorld's legal forms and templates give you a starting point for the agreement with the winning bidder, so it you sign with the winning bidder can be ready before bids come back.
If you must change anything after sending the request, do it in writing and send it to everyone. The University of California manual defines addenda as written changes or interpretations issued after the bidding documents go out and before bids open, and it requires the bid form to be reissued whole if an addendum changes it.
Keep the form short enough that nothing is left to interpretation. A useful bid form includes:
The unit-price line comes straight from public bidding practice. When quantities are uncertain, the University of California manual has the form state approximate quantities, then compares bids by multiplying unit prices by those quantities.
The details here are invented for illustration. A bakery is building a small prep room behind its shop.
| Section | Example entry |
|---|---|
| Invitation | Prep room build-out, bids due Friday, October 30 at 4:00 p.m. by email to the owner |
| Scope | 12 by 14 foot room, framing, drywall, two electrical circuits, sealed floor. Owner supplies the sink and prep table |
| Instructions | Written questions by October 20. Answers sent to all bidders on October 22 |
| Bid form | Base price, price for an added vent hood, start and finish dates |
| Evaluation | Lowest base price among bidders with a license, insurance, and two references |
| Terms | Work completed by December 15. Payment in three milestones. Certificate of insurance before work begins |
| Addenda | One addendum issued October 22 to confirm the floor finish |
Note that the evaluation row names the exact conditions a bidder must meet. A low price from a bidder without insurance does not win.
A request for bid template does not need to be long. It needs a precise scope, a single bid form, and rules you apply the same way to every bidder. Draft those three parts, send them to a short list, and let the comparison do the work.
Once you pick a winner, the next job is turning the bid into an agreement and a schedule. Join EntraWorld free to keep your plan, your contracts, and your next steps in one place while the work gets built.